Coverart for item
The Resource Amending the act authorizing construction of a bridge across the Missouri River from Sioux City, Iowa, and South Sioux City, Nebr., and to extend the time for constructing said bridge. June 7, 1938. -- Referred to the House Calendar and ordered to be printed., (electronic resource)

Amending the act authorizing construction of a bridge across the Missouri River from Sioux City, Iowa, and South Sioux City, Nebr., and to extend the time for constructing said bridge. June 7, 1938. -- Referred to the House Calendar and ordered to be printed., (electronic resource)

Label
Amending the act authorizing construction of a bridge across the Missouri River from Sioux City, Iowa, and South Sioux City, Nebr., and to extend the time for constructing said bridge. June 7, 1938. -- Referred to the House Calendar and ordered to be printed.
Title
Amending the act authorizing construction of a bridge across the Missouri River from Sioux City, Iowa, and South Sioux City, Nebr., and to extend the time for constructing said bridge. June 7, 1938. -- Referred to the House Calendar and ordered to be printed.
Creator
Contributor
Subject
Genre
Language
eng
Member of
Cataloging source
Readex
Government publication
federal national government publication
Index
no index present
Literary form
non fiction
Nature of contents
dictionaries
http://bibfra.me/vocab/lite/organizationName
United States
http://library.link/vocab/relatedWorkOrContributorDate
1878-1944.
http://library.link/vocab/relatedWorkOrContributorName
Eicher, Edward Clayton
Series statement
  • United States congressional serial set;
  • House report / 75th Congress, 3rd session. House
Series volume
  • serial set no. 10235
  • no. 2641
http://library.link/vocab/subjectName
  • Administrative jurisdiction
  • Bridge construction
  • Bridges
  • Legislative amendments
  • Toll bridges
  • Dakota County, Nebraska
  • Missouri River
  • Sioux City, Iowa
  • South Sioux City, Nebraska
Label
Amending the act authorizing construction of a bridge across the Missouri River from Sioux City, Iowa, and South Sioux City, Nebr., and to extend the time for constructing said bridge. June 7, 1938. -- Referred to the House Calendar and ordered to be printed., (electronic resource)
Instantiates
Publication
Color
multicolored
Control code
NB00000245544
Dimensions
unknown
Extent
6 p
Form of item
electronic
Governing access note
Access restricted to subscribing institutions
Reproduction note
Electronic reproduction.
Specific material designation
remote
System control number
(Readex)11D9AB1E9A9C4D38
Terms governing use
©2008 by NewsBank, Inc. All rights reserved
Label
Amending the act authorizing construction of a bridge across the Missouri River from Sioux City, Iowa, and South Sioux City, Nebr., and to extend the time for constructing said bridge. June 7, 1938. -- Referred to the House Calendar and ordered to be printed., (electronic resource)
Publication
Color
multicolored
Control code
NB00000245544
Dimensions
unknown
Extent
6 p
Form of item
electronic
Governing access note
Access restricted to subscribing institutions
Reproduction note
Electronic reproduction.
Specific material designation
remote
System control number
(Readex)11D9AB1E9A9C4D38
Terms governing use
©2008 by NewsBank, Inc. All rights reserved

Library Locations

    • Ladd LibraryBorrow it
      48 Campus Ave, Lewiston, ME, 04240, US
      44.105245 -70.203443
Processing Feedback ...