Coverart for item
The Resource Authorizing the Secretary of the Interior to construct, operate, and maintain the irrigation works comprising the Foster Creek division of the Chief Joseph Dam project, Washington. July 19, 1954. -- Ordered to be printed., (electronic resource)

Authorizing the Secretary of the Interior to construct, operate, and maintain the irrigation works comprising the Foster Creek division of the Chief Joseph Dam project, Washington. July 19, 1954. -- Ordered to be printed., (electronic resource)

Label
Authorizing the Secretary of the Interior to construct, operate, and maintain the irrigation works comprising the Foster Creek division of the Chief Joseph Dam project, Washington. July 19, 1954. -- Ordered to be printed.
Title
Authorizing the Secretary of the Interior to construct, operate, and maintain the irrigation works comprising the Foster Creek division of the Chief Joseph Dam project, Washington. July 19, 1954. -- Ordered to be printed.
Creator
Contributor
Subject
Genre
Language
eng
Member of
Cataloging source
Readex
Government publication
federal national government publication
Index
no index present
Literary form
non fiction
Nature of contents
dictionaries
http://bibfra.me/vocab/lite/organizationName
United States
http://library.link/vocab/relatedWorkOrContributorDate
1889-1973.
http://library.link/vocab/relatedWorkOrContributorName
D'Ewart, Wesley Abner
Series statement
  • United States congressional serial set;
  • House report / 83rd Congress, 2nd session. House
Series volume
  • serial set no. 11742
  • no. 2274
http://library.link/vocab/subjectName
  • United States
  • Congressional conference committees
  • Legislative amendments
  • Chief Joseph Dam (Washington)
  • Washington
Label
Authorizing the Secretary of the Interior to construct, operate, and maintain the irrigation works comprising the Foster Creek division of the Chief Joseph Dam project, Washington. July 19, 1954. -- Ordered to be printed., (electronic resource)
Instantiates
Publication
Color
multicolored
Control code
NB00000291153
Dimensions
unknown
Extent
3 p
Form of item
electronic
Governing access note
Access restricted to subscribing institutions
Reproduction note
Electronic reproduction.
Specific material designation
remote
System control number
(Readex)121014A5C7DEB1B8
Terms governing use
©2008 by NewsBank, Inc. All rights reserved
Label
Authorizing the Secretary of the Interior to construct, operate, and maintain the irrigation works comprising the Foster Creek division of the Chief Joseph Dam project, Washington. July 19, 1954. -- Ordered to be printed., (electronic resource)
Publication
Color
multicolored
Control code
NB00000291153
Dimensions
unknown
Extent
3 p
Form of item
electronic
Governing access note
Access restricted to subscribing institutions
Reproduction note
Electronic reproduction.
Specific material designation
remote
System control number
(Readex)121014A5C7DEB1B8
Terms governing use
©2008 by NewsBank, Inc. All rights reserved

Library Locations

    • Ladd LibraryBorrow it
      48 Campus Ave, Lewiston, ME, 04240, US
      44.105245 -70.203443
Processing Feedback ...