Coverart for item
The Resource Bridge across the St. Clair River at Port Huron, Mich. May 31, 1933. -- Referred to the House Calendar and ordered to be printed., (electronic resource)

Bridge across the St. Clair River at Port Huron, Mich. May 31, 1933. -- Referred to the House Calendar and ordered to be printed., (electronic resource)

Label
Bridge across the St. Clair River at Port Huron, Mich. May 31, 1933. -- Referred to the House Calendar and ordered to be printed.
Title
Bridge across the St. Clair River at Port Huron, Mich. May 31, 1933. -- Referred to the House Calendar and ordered to be printed.
Creator
Contributor
Subject
Genre
Language
eng
Member of
Cataloging source
Readex
Government publication
federal national government publication
Index
no index present
Literary form
non fiction
Nature of contents
dictionaries
http://bibfra.me/vocab/lite/organizationName
United States
http://library.link/vocab/relatedWorkOrContributorDate
1903-1961.
http://library.link/vocab/relatedWorkOrContributorName
Sadowski, George Gregory
Series statement
  • United States congressional serial set;
  • House report / 73rd Congress, 1st session. House
Series volume
  • serial set no. 9774
  • no. 178
http://library.link/vocab/subjectName
  • United States
  • Bridge construction
  • Bridges
  • Legislative amendments
  • Port Huron, Michigan
  • Saint Clair River (Michigan)
  • Sarnia, Ontario
Label
Bridge across the St. Clair River at Port Huron, Mich. May 31, 1933. -- Referred to the House Calendar and ordered to be printed., (electronic resource)
Instantiates
Publication
Note
  • Act Creating the Great Lakes Bridge Commission and Authorizing Said Commission and Its Successors To Construct, Maintain, and Operate a Bridge across the Saint Clair River at or near Port Huron, Michigan (1930), p. 2
  • Act To Extend the Times for Commencing and Completing the Construction of a Bridge across the Saint Clair River at or near Port Huron, Michigan (1931), p. 6
Color
multicolored
Control code
NB00000229647
Dimensions
unknown
Extent
6 p
Form of item
electronic
Governing access note
Access restricted to subscribing institutions
Reproduction note
Electronic reproduction.
Specific material designation
remote
System control number
(Readex)11CC20A4329A48E0
Terms governing use
©2007 by NewsBank, Inc. All rights reserved
Label
Bridge across the St. Clair River at Port Huron, Mich. May 31, 1933. -- Referred to the House Calendar and ordered to be printed., (electronic resource)
Publication
Note
  • Act Creating the Great Lakes Bridge Commission and Authorizing Said Commission and Its Successors To Construct, Maintain, and Operate a Bridge across the Saint Clair River at or near Port Huron, Michigan (1930), p. 2
  • Act To Extend the Times for Commencing and Completing the Construction of a Bridge across the Saint Clair River at or near Port Huron, Michigan (1931), p. 6
Color
multicolored
Control code
NB00000229647
Dimensions
unknown
Extent
6 p
Form of item
electronic
Governing access note
Access restricted to subscribing institutions
Reproduction note
Electronic reproduction.
Specific material designation
remote
System control number
(Readex)11CC20A4329A48E0
Terms governing use
©2007 by NewsBank, Inc. All rights reserved

Library Locations

    • Ladd LibraryBorrow it
      48 Campus Ave, Lewiston, ME, 04240, US
      44.105245 -70.203443
Processing Feedback ...