The Resource Extending of time for construction of a bridge across the Missouri River at or near Arrow Rock, Mo. June 13, 1940. -- Referred to the House Calendar and ordered to be printed., (electronic resource)
Extending of time for construction of a bridge across the Missouri River at or near Arrow Rock, Mo. June 13, 1940. -- Referred to the House Calendar and ordered to be printed., (electronic resource)
Resource Information
The item Extending of time for construction of a bridge across the Missouri River at or near Arrow Rock, Mo. June 13, 1940. -- Referred to the House Calendar and ordered to be printed., (electronic resource) represents a specific, individual, material embodiment of a distinct intellectual or artistic creation found in Bates College.This item is available to borrow from 1 library branch.
Resource Information
The item Extending of time for construction of a bridge across the Missouri River at or near Arrow Rock, Mo. June 13, 1940. -- Referred to the House Calendar and ordered to be printed., (electronic resource) represents a specific, individual, material embodiment of a distinct intellectual or artistic creation found in Bates College.
This item is available to borrow from 1 library branch.
- Language
- eng
- Extent
- 3 p
- Note
-
- Act Authorizing the Construction of a Bridge across the Missouri River near Saint Charles, Missouri (1929), p. 2
- Act To Extend the Times for Commencing and Completing the Construction of a Bridge across the Missouri River at or near Arrow Rock, Missouri (1932), p. 2
- Act To Extend the Times for Commencing and Completing the Construction of a Bridge across the Missouri River at or near Arrow Rock, Missouri (1937), p. 3
- Label
- Extending of time for construction of a bridge across the Missouri River at or near Arrow Rock, Mo. June 13, 1940. -- Referred to the House Calendar and ordered to be printed.
- Title
- Extending of time for construction of a bridge across the Missouri River at or near Arrow Rock, Mo. June 13, 1940. -- Referred to the House Calendar and ordered to be printed.
- Subject
-
- Act To Authorize the Construction of Certain Bridges and To Extend the Times for Commencing and/or Completing the Construction of Other Bridges over the Navigable Waters of the United States, and for Other Purposes
- Act To Extend the Times for Commencing and Completing the Construction of a Bridge across the Missouri River at or near Arrow Rock, Missouri
- Act To Extend the Times for Commencing and Completing the Construction of a Bridge across the Missouri River at or near Arrow Rock, Missouri
- Arrow Rock, Missouri
- Bridge construction
- Bridges
- Legislative Report - Public Bills
- Missouri River
- Railroads
- Saint Louis - Kansas City Short Line Railroad Company
- Act Authorizing the Construction of a Bridge across the Missouri River near Saint Charles, Missouri
- Language
- eng
- Cataloging source
- Readex
- Government publication
- federal national government publication
- Index
- no index present
- Literary form
- non fiction
- Nature of contents
- dictionaries
- http://bibfra.me/vocab/lite/organizationName
- United States
- http://library.link/vocab/relatedWorkOrContributorDate
- 1909-1992.
- http://library.link/vocab/relatedWorkOrContributorName
- Boren, Lyle H.
- Series statement
-
- United States congressional serial set;
- House report / 76th Congress, 3rd session. House
- Series volume
-
- serial set no. 10443
- no. 2525
- http://library.link/vocab/subjectName
-
- Saint Louis - Kansas City Short Line Railroad Company
- Bridge construction
- Bridges
- Railroads
- Arrow Rock, Missouri
- Missouri River
- Label
- Extending of time for construction of a bridge across the Missouri River at or near Arrow Rock, Mo. June 13, 1940. -- Referred to the House Calendar and ordered to be printed., (electronic resource)
- Note
-
- Act Authorizing the Construction of a Bridge across the Missouri River near Saint Charles, Missouri (1929), p. 2
- Act To Extend the Times for Commencing and Completing the Construction of a Bridge across the Missouri River at or near Arrow Rock, Missouri (1932), p. 2
- Act To Extend the Times for Commencing and Completing the Construction of a Bridge across the Missouri River at or near Arrow Rock, Missouri (1937), p. 3
- Color
- multicolored
- Control code
- NB00000251255
- Dimensions
- unknown
- Extent
- 3 p
- Form of item
- electronic
- Governing access note
- Access restricted to subscribing institutions
- Reproduction note
- Electronic reproduction.
- Specific material designation
- remote
- System control number
- (Readex)11E0DFA0ED608038
- Terms governing use
- ©2008 by NewsBank, Inc. All rights reserved
- Label
- Extending of time for construction of a bridge across the Missouri River at or near Arrow Rock, Mo. June 13, 1940. -- Referred to the House Calendar and ordered to be printed., (electronic resource)
- Note
-
- Act Authorizing the Construction of a Bridge across the Missouri River near Saint Charles, Missouri (1929), p. 2
- Act To Extend the Times for Commencing and Completing the Construction of a Bridge across the Missouri River at or near Arrow Rock, Missouri (1932), p. 2
- Act To Extend the Times for Commencing and Completing the Construction of a Bridge across the Missouri River at or near Arrow Rock, Missouri (1937), p. 3
- Color
- multicolored
- Control code
- NB00000251255
- Dimensions
- unknown
- Extent
- 3 p
- Form of item
- electronic
- Governing access note
- Access restricted to subscribing institutions
- Reproduction note
- Electronic reproduction.
- Specific material designation
- remote
- System control number
- (Readex)11E0DFA0ED608038
- Terms governing use
- ©2008 by NewsBank, Inc. All rights reserved
Subject
- Act To Authorize the Construction of Certain Bridges and To Extend the Times for Commencing and/or Completing the Construction of Other Bridges over the Navigable Waters of the United States, and for Other Purposes
- Act To Extend the Times for Commencing and Completing the Construction of a Bridge across the Missouri River at or near Arrow Rock, Missouri
- Act To Extend the Times for Commencing and Completing the Construction of a Bridge across the Missouri River at or near Arrow Rock, Missouri
- Arrow Rock, Missouri
- Bridge construction
- Bridges
- Legislative Report - Public Bills
- Missouri River
- Railroads
- Saint Louis - Kansas City Short Line Railroad Company
- Act Authorizing the Construction of a Bridge across the Missouri River near Saint Charles, Missouri
Genre
Member of
Embed
Settings
Select options that apply then copy and paste the RDF/HTML data fragment to include in your application
Embed this data in a secure (HTTPS) page:
Layout options:
Include data citation:
<div class="citation" vocab="http://schema.org/"><i class="fa fa-external-link-square fa-fw"></i> Data from <span resource="http://link.bates.edu/portal/Extending-of-time-for-construction-of-a-bridge/gp0JhUKxOjY/" typeof="Book http://bibfra.me/vocab/lite/Item"><span property="name http://bibfra.me/vocab/lite/label"><a href="http://link.bates.edu/portal/Extending-of-time-for-construction-of-a-bridge/gp0JhUKxOjY/">Extending of time for construction of a bridge across the Missouri River at or near Arrow Rock, Mo. June 13, 1940. -- Referred to the House Calendar and ordered to be printed., (electronic resource)</a></span> - <span property="potentialAction" typeOf="OrganizeAction"><span property="agent" typeof="LibrarySystem http://library.link/vocab/LibrarySystem" resource="http://link.bates.edu/"><span property="name http://bibfra.me/vocab/lite/label"><a property="url" href="http://link.bates.edu/">Bates College</a></span></span></span></span></div>
Note: Adjust the width and height settings defined in the RDF/HTML code fragment to best match your requirements
Preview
Cite Data - Experimental
Data Citation of the Item Extending of time for construction of a bridge across the Missouri River at or near Arrow Rock, Mo. June 13, 1940. -- Referred to the House Calendar and ordered to be printed., (electronic resource)
Copy and paste the following RDF/HTML data fragment to cite this resource
<div class="citation" vocab="http://schema.org/"><i class="fa fa-external-link-square fa-fw"></i> Data from <span resource="http://link.bates.edu/portal/Extending-of-time-for-construction-of-a-bridge/gp0JhUKxOjY/" typeof="Book http://bibfra.me/vocab/lite/Item"><span property="name http://bibfra.me/vocab/lite/label"><a href="http://link.bates.edu/portal/Extending-of-time-for-construction-of-a-bridge/gp0JhUKxOjY/">Extending of time for construction of a bridge across the Missouri River at or near Arrow Rock, Mo. June 13, 1940. -- Referred to the House Calendar and ordered to be printed., (electronic resource)</a></span> - <span property="potentialAction" typeOf="OrganizeAction"><span property="agent" typeof="LibrarySystem http://library.link/vocab/LibrarySystem" resource="http://link.bates.edu/"><span property="name http://bibfra.me/vocab/lite/label"><a property="url" href="http://link.bates.edu/">Bates College</a></span></span></span></span></div>