Coverart for item
The Resource Extending of time for construction of a bridge across the Missouri River at or near Arrow Rock, Mo. June 13, 1940. -- Referred to the House Calendar and ordered to be printed., (electronic resource)

Extending of time for construction of a bridge across the Missouri River at or near Arrow Rock, Mo. June 13, 1940. -- Referred to the House Calendar and ordered to be printed., (electronic resource)

Label
Extending of time for construction of a bridge across the Missouri River at or near Arrow Rock, Mo. June 13, 1940. -- Referred to the House Calendar and ordered to be printed.
Title
Extending of time for construction of a bridge across the Missouri River at or near Arrow Rock, Mo. June 13, 1940. -- Referred to the House Calendar and ordered to be printed.
Creator
Contributor
Subject
Genre
Language
eng
Member of
Cataloging source
Readex
Government publication
federal national government publication
Index
no index present
Literary form
non fiction
Nature of contents
dictionaries
http://bibfra.me/vocab/lite/organizationName
United States
http://library.link/vocab/relatedWorkOrContributorDate
1909-1992.
http://library.link/vocab/relatedWorkOrContributorName
Boren, Lyle H.
Series statement
  • United States congressional serial set;
  • House report / 76th Congress, 3rd session. House
Series volume
  • serial set no. 10443
  • no. 2525
http://library.link/vocab/subjectName
  • Saint Louis - Kansas City Short Line Railroad Company
  • Bridge construction
  • Bridges
  • Railroads
  • Arrow Rock, Missouri
  • Missouri River
Label
Extending of time for construction of a bridge across the Missouri River at or near Arrow Rock, Mo. June 13, 1940. -- Referred to the House Calendar and ordered to be printed., (electronic resource)
Instantiates
Publication
Note
  • Act Authorizing the Construction of a Bridge across the Missouri River near Saint Charles, Missouri (1929), p. 2
  • Act To Extend the Times for Commencing and Completing the Construction of a Bridge across the Missouri River at or near Arrow Rock, Missouri (1932), p. 2
  • Act To Extend the Times for Commencing and Completing the Construction of a Bridge across the Missouri River at or near Arrow Rock, Missouri (1937), p. 3
Color
multicolored
Control code
NB00000251255
Dimensions
unknown
Extent
3 p
Form of item
electronic
Governing access note
Access restricted to subscribing institutions
Reproduction note
Electronic reproduction.
Specific material designation
remote
System control number
(Readex)11E0DFA0ED608038
Terms governing use
©2008 by NewsBank, Inc. All rights reserved
Label
Extending of time for construction of a bridge across the Missouri River at or near Arrow Rock, Mo. June 13, 1940. -- Referred to the House Calendar and ordered to be printed., (electronic resource)
Publication
Note
  • Act Authorizing the Construction of a Bridge across the Missouri River near Saint Charles, Missouri (1929), p. 2
  • Act To Extend the Times for Commencing and Completing the Construction of a Bridge across the Missouri River at or near Arrow Rock, Missouri (1932), p. 2
  • Act To Extend the Times for Commencing and Completing the Construction of a Bridge across the Missouri River at or near Arrow Rock, Missouri (1937), p. 3
Color
multicolored
Control code
NB00000251255
Dimensions
unknown
Extent
3 p
Form of item
electronic
Governing access note
Access restricted to subscribing institutions
Reproduction note
Electronic reproduction.
Specific material designation
remote
System control number
(Readex)11E0DFA0ED608038
Terms governing use
©2008 by NewsBank, Inc. All rights reserved

Library Locations

    • Ladd LibraryBorrow it
      48 Campus Ave, Lewiston, ME, 04240, US
      44.105245 -70.203443
Processing Feedback ...