Coverart for item
The Resource Extending the times for commencing and completing construction of bridge over Missouri River at or near Niobrara, Nebr. May 12, 1938. -- Referred to the House Calendar and ordered to be printed., (electronic resource)

Extending the times for commencing and completing construction of bridge over Missouri River at or near Niobrara, Nebr. May 12, 1938. -- Referred to the House Calendar and ordered to be printed., (electronic resource)

Label
Extending the times for commencing and completing construction of bridge over Missouri River at or near Niobrara, Nebr. May 12, 1938. -- Referred to the House Calendar and ordered to be printed.
Title
Extending the times for commencing and completing construction of bridge over Missouri River at or near Niobrara, Nebr. May 12, 1938. -- Referred to the House Calendar and ordered to be printed.
Creator
Contributor
Subject
Genre
Language
eng
Member of
Cataloging source
Readex
Government publication
federal national government publication
Index
no index present
Literary form
non fiction
Nature of contents
dictionaries
http://bibfra.me/vocab/lite/organizationName
United States
http://library.link/vocab/relatedWorkOrContributorDate
1878-1944.
http://library.link/vocab/relatedWorkOrContributorName
Eicher, Edward Clayton
Series statement
  • United States congressional serial set;
  • House report / 75th Congress, 3rd session. House
Series volume
  • serial set no. 10234
  • no. 2349
http://library.link/vocab/subjectName
  • Bridge construction
  • Bridges
  • Legislative amendments
  • Knox County, Nebraska
  • Missouri River
  • Niobrara, Nebraska
Label
Extending the times for commencing and completing construction of bridge over Missouri River at or near Niobrara, Nebr. May 12, 1938. -- Referred to the House Calendar and ordered to be printed., (electronic resource)
Instantiates
Publication
Note
Act To Extend the Times for Commencing and Completing the Construction of a Bridge across the Missouri River at or near Niobrara, Nebraska (1937), p. 3
Color
multicolored
Control code
NB00000244985
Dimensions
unknown
Extent
3 p
Form of item
electronic
Governing access note
Access restricted to subscribing institutions
Reproduction note
Electronic reproduction.
Specific material designation
remote
System control number
(Readex)11DD54C286B76410
Terms governing use
©2008 by NewsBank, Inc. All rights reserved
Label
Extending the times for commencing and completing construction of bridge over Missouri River at or near Niobrara, Nebr. May 12, 1938. -- Referred to the House Calendar and ordered to be printed., (electronic resource)
Publication
Note
Act To Extend the Times for Commencing and Completing the Construction of a Bridge across the Missouri River at or near Niobrara, Nebraska (1937), p. 3
Color
multicolored
Control code
NB00000244985
Dimensions
unknown
Extent
3 p
Form of item
electronic
Governing access note
Access restricted to subscribing institutions
Reproduction note
Electronic reproduction.
Specific material designation
remote
System control number
(Readex)11DD54C286B76410
Terms governing use
©2008 by NewsBank, Inc. All rights reserved

Library Locations

    • Ladd LibraryBorrow it
      48 Campus Ave, Lewiston, ME, 04240, US
      44.105245 -70.203443
Processing Feedback ...